Bow thruster repair Port of Rotterdam
After previous problem with the Bow Thruster an underwater inspection was arranged.The Bow Thruster Unit had internal damage and the decision was made to remove the Unit and Overhaul it in our Propulsion department.
An FN Operations team prepared and executed the complete removal and overhaul of the Bow Thruster Unit in Rotterdam, 13 days later the Propulsion Unit was successfully re-installed.